Route 895 Construction - December 2001

Here's 10 photos of Route 895 under construction, taken in late December, 2001.

Photos #1 and #2 show Route 895 from the Osborne Turnpike overpass bridge, looking west onto Route 895 toward the mainline toll plaza construction and the Route 895 James River Bridge construction. Highway sign installation is underway. Paving work is near completion on this section, with lines painted on the eastbound roadway. Photos #3 and #4 show Route 895 from the Osborne Turnpike overpass bridge, looking east onto Route 895 toward Laburnum Avenue. Photo #5 shows reconstructed Osborne Turnpike and its overpass bridge over Route 895.

Photo #6 shows Route 895, taken looking west from the VA-5 New Market Road overpass. Photos #7 and #8 show Route 895 from the Wilton Road overpass bridge, looking east onto Route 895 toward Osborne Turnpike. Paving work is near completion on this section, with lines painted on the eastbound roadway. Photos #9 and #10 show Route 895 from the Wilton Road overpass bridge, looking west onto Route 895 toward the mainline toll plaza construction and the Route 895 James River Bridge construction. Highway sign installation is underway.

Route 895 Construction - December 2001 - Photos 1-5
Route 895 Construction - December 2001 - Photos 6-10

Lead page for Route 895 Construction
Lead page for
Route 895 Connector

Back to top

By Scott M. Kozel, Roads to the Future

(Created 2-1-2002)