Here's 3 photos of Route 895 under construction, taken in March, 2002.

 
Above, Ramp E, which is the mostly elevated ramp from I-95 northbound to Route 895 eastbound. This is the approach to the ramp from I-95 northbound. The high spans to the center and left of the photo are the Route 895 mainline concrete box girder approach spans which are being built by the precast post-tensioned segmental method, with the segments being placed by the overhead launching truss which is visible as the yellow structure above the approach spans.


Above, Ramp E, which is the mostly elevated ramp from I-95 northbound to Route 895 eastbound. This is looking straight up the centerline of the ramp. Its construction is nearing completion.


Above, Ramp E, which is the mostly elevated ramp from I-95 northbound to Route 895 eastbound. This is looking at the west side of the ramp. The I-95 northbound roadway is visible along the left edge of the photo.

Next: Route 895 Construction - March 2002 - Photos 7-9

© Copyright 2002 by Scott Kozel, and all photos taken by same. All rights reserved.

Lead page for Route 895 Construction - March 2002
Lead page for
Route 895 Construction
Lead page for
Route 895 Connector (Pocahontas Parkway)

Back to top

By Scott M. Kozel, Roads to the Future

(Created 5-1-2002)